“This microgrid plant with 100kW floating solar system and 218kWh with battery storage is in place now for trial and we will study and analyse for a year before deciding to expand the model in other locations within our distribution area,” CESC MD (Distribution) Debasish U Banerjee told PTI.”This microgrid plant with 100kW floating solar system and 218kWh with battery storage is in place now for trial and we will study and analyse for a year before deciding to expand the model in other locations within our distribution area,” CESC MD (Distribution) Debasish U Banerjee told PTI.
Related Articles
International News
Govt notifies Green Open Access Rules 2022; reduces open access transaction limit to 100 kW
The ministry said that these Rules would enable simplified procedures for the open access, uniform banking, and voluntary purchase of RE power by C&I consumersNew Delhi: TheMinistry of Poweron Monday notified theGreen Open Access Rules, […]
International News
Sterling and Wilson Renewable Energy bags order worth Rs 2,212 crore from NTPC REL
SWRE has emerged as the lowest bidder in a competitive bidding against the tender invited by NTPC REL and has been awarded the contract on 01.10.2022 with total value of Rs 2,212 crore (including taxes […]
International News
Waaree Energies gets NCLT approval to acquire Indosolar
This acquisition will facilitate augmentation of the solar cell manufacturing capacity of Waaree Energies to 5.4 GW from the currently planned 4 GW and will complement its planned expansion in solar module manufacturing, it added. […]


