CESC commissions first microgrid with floating solar & BESS

Tax Savings Calculator Tool

“This microgrid plant with 100kW floating solar system and 218kWh with battery storage is in place now for trial and we will study and analyse for a year before deciding to expand the model in other locations within our distribution area,” CESC MD (Distribution) Debasish U Banerjee told PTI.”This microgrid plant with 100kW floating solar system and 218kWh with battery storage is in place now for trial and we will study and analyse for a year before deciding to expand the model in other locations within our distribution area,” CESC MD (Distribution) Debasish U Banerjee told PTI.