Chevron working to resume full Gorgon LNG production after ‘mechanical fault’

Chevron

Chevron Australia, a unit of US energy giant Chevron, is working to resume full production from its Gorgon LNG terminal in Western Australia following a “mechanical fault” which is affecting one LNG production train.

“The fault occurred about 3pm AWST on Tuesday, April 30 in a turbine,” a Chevron Australia spokesperson told LNG Prime on Friday.

The spokesperson said there were no injuries or impacts to personnel associated with the fault.

According to spokesperson, repair activities have started and are expected to “take a number of weeks”.

“Domestic gas and the remaining two LNG production trains at Gorgon are unaffected and are producing at full rates,” the spokesperson said.

“Relevant stakeholders have been notified and we will continue to keep them informed as we complete the repair work and safely resume full production,” the spokesperson added.

The Gorgon LNG plant located on Barrow Island has a production capacity of about 15.6 mtpa.

The Chevron-operated project is a joint venture of Chevron (47.3 percent), ExxonMobil (25 percent), Shell (25 percent), Osaka Gas (1.25 percent), MidOcean Energy (1 percent), and also JERA (0.417 percent).

Last year, the plant’s third train was offline during a big part of November due to an “electrical incident”.

Prior to that, Chevron and its workers at the Gorgon and Wheatstone LNG terminals agreed on new labor agreements following lengthy negotiations between Chevron and unions representing the workers.

The Wheatstone LNG plant near Onslow has a capacity of about 8.9 mtpa.

Source: Lngprime.com

Take the Survey at https://survey.energynewsbeat.com/

1031 Exchange E-Book

ENB Top News 
ENB
Energy Dashboard
ENB Podcast
ENB Substack

About Stu Turley 4798 Articles
Stuart Turley is President and CEO of Sandstone Group, a top energy data, and finance consultancy working with companies all throughout the energy value chain. Sandstone helps both small and large-cap energy companies to develop customized applications and manage data workflows/integration throughout the entire business. With experience implementing enterprise networks, supercomputers, and cellular tower solutions, Sandstone has become a trusted source and advisor.   He is also the Executive Publisher of www.energynewsbeat.com, the best source for 24/7 energy news coverage, and is the Co-Host of the energy news video and Podcast Energy News Beat. Energy should be used to elevate humanity out of poverty. Let's use all forms of energy with the least impact on the environment while being sustainable without printing money. Stu is also a co-host on the 3 Podcasters Walk into A Bar podcast with David Blackmon, and Rey Trevino. Stuart is guided by over 30 years of business management experience, having successfully built and help sell multiple small and medium businesses while consulting for numerous Fortune 500 companies. He holds a B.A in Business Administration from Oklahoma State and an MBA from Oklahoma City University.