He said that the government should be aiming for a minimum of 2 GW to 3 GW of annual capacity addition by 2025-26 through the PLI schemeHe said that the government should be aiming for a minimum of 2 GW to 3 GW of annual capacity addition by 2025-26 through the PLI schemeHe said that the government should be aiming for a minimum of 2 GW to 3 GW of annual capacity addition by 2025-26 through the PLI scheme
Related Articles
International News
Telangana CM statement a lie; states free to buy RE from any developer based on bids: R K Singh
States are free to hold their own bids and buy renewable energy(RE) from any developer based on those bidsNew Delhi: Union ministerR K Singhon Tuesday dismissed a speech by Telangana Chief Minister and clarified that […]
International News
India’s solar rooftop market grew by 53 per cent in 12-month period from July 2020
It added that the residential segment added 488 MW capacity, a 360 per cent increase year-on-yearNew Delhi: Indian rooftop solar market grew by 1,748 megawatt (MW), a 53 per cent year-on-year (y-o-y) increase, in the […]
International News
Oil India commissions India’s first 99.99% pure Green Hydrogen pilot plant
The plant produces Green Hydrogen from the electricity generated by the existing 500kW Solar plant using a 100 kW Anion Exchange Membrane (AEM) Electrolyser array. The use of AEM technology is being used for the […]


