CESC commissions first microgrid with floating solar & BESS

“This microgrid plant with 100kW floating solar system and 218kWh with battery storage is in place now for trial and we will study and analyse for a year before deciding to expand the model in other locations within our distribution area,” CESC MD (Distribution) Debasish U Banerjee told PTI.”This microgrid plant with 100kW floating solar system and 218kWh with battery storage is in place now for trial and we will study and analyse for a year before deciding to expand the model in other locations within our distribution area,” CESC MD (Distribution) Debasish U Banerjee told PTI.