An Economic Assessment of the 765-kV Strategic Transmission Expansion Plan Brent Bennett, Ph.D. talks about An Alternative Approach to Enable Cost-Effective Growth

Texas is facing explosive electricity demand growth from the Permian Basin’s oil and gas operations, data centers, manufacturing, and electrification. In response, ERCOT and the Public Utility Commission of Texas (PUC) have fast-tracked the 765-kV Strategic Transmission Expansion Plan (STEP)—including the Permian Basin Reliability Plan (PBRP)—a massive build-out of high-voltage transmission lines designed to import […]

Continue Reading

Ensuring a Reliable and Affordable Texas Grid: An Interview with Dr. Brent Bennett of the Texas Public Policy Foundation

Just in time for the potentially crippling storm hitting the Southern Half of the United States, this podcast interview with Dr. Brett Bennett of the Texas Public Policy Foundation highlights the money spent on wind and solar, but not on resilience. While significant improvements have been made to the ERCOT Grid system, a fundamental issue […]

Continue Reading