He said that the government should be aiming for a minimum of 2 GW to 3 GW of annual capacity addition by 2025-26 through the PLI schemeHe said that the government should be aiming for a minimum of 2 GW to 3 GW of annual capacity addition by 2025-26 through the PLI schemeHe said that the government should be aiming for a minimum of 2 GW to 3 GW of annual capacity addition by 2025-26 through the PLI scheme
Related Articles
Petroleum Minister Puri, Israeli envoy inaugurate IOC Phinergy pavilion at Auto Expo
IOC Phinergy Private Limited’s pavilion will showcase aluminium-air technology and applications in e-mobility. Formed in 2021, IOC Phinergy Private Limited is a joint venture between Indian Oil Corporation Limited and Israeli start-up company Phinergy, as […]
Banks pocket $12 million in fees in Adani’s mega share sale
The fees are equivalent to around 0.5 per cent of the 200 billion rupees raised in Adani Enterprises Ltd.’s offering, said the people, who asked not to be identified as the information is private. Investment […]
Singapore’s company monitors potential of wind energy off Gujarat and Tamil Nadu
Anil Bhatia, Vice President for Renewable and Hybrid Energy at HBA, said strong winds across deep seas off Gujarat and Tamil Nadu are most suitable for installing bigger wind turbines, ranging from size of 12 […]