Wison installs all SPB tanks on Eni’s FLNG

Wison

China’s Wison New Energies has installed all four SPB LNG tanks and two LPG tanks on Eni’s Congo FLNG.

The company, previously known as Wison Offshore & Marine, said in a social media post on Monday that the final lifting of LNG and LPG CCS for the Marine XII Offshore FLNG project (Congo FLNG) had been successfully completed on April 23.

The first SPB (self-supporting prismatic shape IMO type B) LNG tank was on March 2 hoisted into the hull cargo hold space at its Nantong yard.

WNE previously said the SPB tank, designed and constructed by the company, is the world’s largest SPB tank and it is the core equipment of the Eni Congo LNG project.

The entire tank is 45 meters long, 44.9 meters wide, with a main body height of 24 meters and a total height of over 31 meters.

Also, the tank has a volume of 45,000 cubic meters, with a total weight exceeding 1,400 tons.

The first SPB LNG tank was installed in March (Image: Wison New Energies)

WNE won a contract from Italy’s Eni in December 2022 to build a 380 meters long 2.4 mtpa FLNG and officially started work on the project in January last year.

It will be able to store over 180,000 cubic meters of LNG.

The FLNG will serve Eni’s Congo project which will reach an overall LNG production capacity of 3 million tons per year, or about 4.5 billion cubic meters/year, from 2025.

In February Eni shipped the first LNG cargo from its Tango floating LNG facility moored in Congolese waters and this shipment arrived last month at Snam’s FSRU-based facility in Piombino.

The Italian firm purchased the 144 meters long Tango FLNG from Belgium’s Exmar and chartered the 2002-built steam turbine LNG carrier, Excalibur, to serve as an FSU for the project.

The floating LNG producer, delivered in 2017 by Wison, has a liquefaction capacity of about 1 billion cubic meters per year of gas, or 0.6 mtpa, and a storage capacity of 16,100 cbm.

Source: Lngprime.com

Take the Survey at https://survey.energynewsbeat.com/

1031 Exchange E-Book

ENB Top News 
ENB
Energy Dashboard
ENB Podcast
ENB Substack

About Stu Turley 3651 Articles
Stuart Turley is President and CEO of Sandstone Group, a top energy data, and finance consultancy working with companies all throughout the energy value chain. Sandstone helps both small and large-cap energy companies to develop customized applications and manage data workflows/integration throughout the entire business. With experience implementing enterprise networks, supercomputers, and cellular tower solutions, Sandstone has become a trusted source and advisor.   He is also the Executive Publisher of www.energynewsbeat.com, the best source for 24/7 energy news coverage, and is the Co-Host of the energy news video and Podcast Energy News Beat. Energy should be used to elevate humanity out of poverty. Let's use all forms of energy with the least impact on the environment while being sustainable without printing money. Stu is also a co-host on the 3 Podcasters Walk into A Bar podcast with David Blackmon, and Rey Trevino. Stuart is guided by over 30 years of business management experience, having successfully built and help sell multiple small and medium businesses while consulting for numerous Fortune 500 companies. He holds a B.A in Business Administration from Oklahoma State and an MBA from Oklahoma City University.