New Mountain Valley Pipeline to begin operations

Mountain Valley Pipeline

On June 11, the Federal Energy Regulatory Commission (FERC) authorized the Mountain Valley Pipeline (MVP) to begin operations. MVP, 303 miles long, can move up to 2.0 billion cubic feet per day (Bcf/d) of natural gas from Wetzel County, West Virginia, to an interconnection with Transcontinental Gas Pipeline’s (Transco) compressor station 165 in Pittsylvania County, Virginia. Transco delivers natural gas through a 10,000-mile interstate transmission pipeline system extending from South Texas to New York.

MVP has signed long-term agreements with multiple shippers for the full capacity of the pipeline for at least 20 years from the in-service date. MVP will enable its shippers to access markets in the Northeast, mid-Atlantic, and Southeast United States.

In March 2024, EQT Corporation (EQT) acquired Equitrans Midstream Corporation, operator of MVP, creating a vertically integrated natural gas business in the Appalachian Basin with investments in natural gas production and transportation. EQT was the largest natural gas producing company in the United States in 2023, producing the equivalent of an average of 6.1 Bcf/d with associated liquids.

Source: Eia.gov

Take the Survey at https://survey.energynewsbeat.com/

1031 Exchange E-Book

Crude Oil, LNG, Jet Fuel price quote

ENB Top News 
ENB
Energy Dashboard
ENB Podcast
ENB Substack

Be the first to comment

Leave a Reply

Your email address will not be published.


*